The PT shall take into consideration the scope of IEC TC18 and develop a document that recommend the design, safety requirements, operation and functionality of High Voltage Shore Connection Systems (HVSC Systems) of ships in ports.
The document will also foster interchangeability of parts and ease the selection and procurement of equipment, including socket outlets and cables for transport of energy, signals and data, by indicating, as appropriate, IEC standards of ratings, types, dimensions, materials, quality, test methods, etc., whether or not these are influenced by regulations.
The document will incorporate good practice and aligning as far as possible existing regulations and IEC publications.